Travel and Active Holiday
Q1
Surprisingly, the bridge was built at a cost of $200 million without any ..... from taxpayers. It was financed with toll bonds.
(*) reversal
(*) renewal
(*) revenue
(*) revenge
Surprisingly, the bridge was built at a cost of $200 million without any ..... from taxpayers. It was financed with toll bonds.
(*) reversal
(*) renewal
(*) revenue
(*) revenge
© 2021 English.best. All rights reserved. | Website Designed by Softvoya